Incoming
Supplier lot, date code, incoming inspection result, and MSL handling for moisture-sensitive parts.
Quality system
Incoming, in-process, and outgoing gates sit inside the same MES record so a failed lot cannot quietly move downstream.
Control plan
Every program receives a control plan before mass production. First-article data, process capability, and customer-specific quality agreements are stored with the work order.
Operators work under ESD discipline. Critical processes are locked by recipe. Nonconformances open a contained MRB path rather than informal rework.
Acceptability of electronic assemblies
Quality management system
Environmental management
ANSI/ESD S20.20 practice on the floor
Traceability
Supplier lot, date code, incoming inspection result, and MSL handling for moisture-sensitive parts.
Stencil lot, reflow profile, AOI result, ICT / FCT status, and operator or cell ID.
Final audit sample, pack configuration, serial range, and shipping document linked to the work order.
Next step
We can include process flow, sample control plan, and first-article template.